HiBA Engineering Est. financed, designed and installed a photovoltaic system of 486 KWp for Al-Mohannad Plastic Industries; including all equipment required by the system and followed up the approvals with the utility provider until the system was fully in operation and connected to grid.
HiBA Engineering financed this project of 4.75% interest, two-months after Central Bank of Jordan processing.
The system is installed by a special mounting system to achieve the best utilization of space above the industrial roof. The total number of PV cells installed is 1474 cells (each is 330 Wp) connected to 14 string inverters.
The PV system cover 15% of the factory consumption by generating 790 MWh/year. The system is highly efficient and the energy yield was above expectation.